KP06 CO-FM issue

$
0
0

Hi everyone,

 

When we are on a new implementation of ECC6 EHP7 with HANA DB. The project is in realization phase. The modules are FICO (COPA and MTO-w/o ML), FM, PP, SD, MM, PM, QM, HCM.

 

The process was alright before FM activation but after that when we are doing kp26 the system through a dump which is now solved through SAP Note 2239329. Now when we are doing KP06 of the same (fiscal year/period/activity type/cost center/fund/cost element) the system through an error message K8057 No valid characteristic combinations found (check the error log). And as per instructions given in the said error message, when i goto extras-->error log-->combination, the system shows error message GM052 No activity type planning carried out for O JIGGER-1/FOH. Note that O JIGGER-1 is cost center and FOH is activity type. After debugging the abaper says that there seems to be a missing patch from basis side but he is also not sure about that. Anyone who is facing the same issue, kindly help.


Viewing all articles
Browse latest Browse all 3074

Trending Articles